Cost Engineering

The independent budget the contractor has no incentive to give you.

The moment

At any stage where the budget is a critical decision variable.

The problem

The owner cannot tell whether the budget presented to them is correct, competitive or inflated — because they have neither the market reference nor the technical experience to challenge it with evidence. They approve numbers they can neither defend nor audit.

Who is it for?

For the American, Japanese, South Korean or European manufacturer setting up industrial operations in Mexico, mainly in the northeast. It has no local team to manage the construction of its plant.

Its greatest pain: building in a country whose construction market, regulations, contractors and negotiating dynamics it does not know. Without a reliable local technical representative, it is fully exposed to the contractor's interests.

For the business owner or investor who wants to bound and clarify what executing the project will cost, and to make cost adjustments or value engineering decisions before starting.

What we do

Preparation of independent cost estimates at three levels of precision according to the project stage: parametric conceptual estimate (decision stage), tender budget with a bill of quantities (contracting stage), and cost control during execution (construction stage). Fully independent from the contractor — no conflict of interest. Applicable to all three sectors: industrial, vertical and horizontal.

The outcome

A defensible number, built from real market references, that the owner can use to negotiate, contract and control.

Cost Engineering at Valor Proyectos is not trying to get the project approved — it is trying to get the number right. The founding partners know from the inside how contractors build their budgets — they know exactly where the margin is inflated and where the risk is real.

The cost of skipping it

A single wrong number discovered midway through construction costs more than validating the budget before signing. The difference is when you see it.

Deliverables

  • Cost estimate with calculation record
  • Market references
  • Variance analysis against the contractor's proposal (where applicable)

Applies to

Industrial Vertical Horizontal

Geographic availability

Nationwide. An analytical service that can be carried out remotely.

Relevant case

Value engineering on an industrial roof — a reduction of 4 kg/m² in structural weight, a saving the contractor had no incentive to propose. (Career experience of the founding partners, at previous construction companies.)

The question everyone asks

"Isn't the budget the contractor already gave me enough?" Cost Engineering at Valor Proyectos is not trying to get the project approved — it is trying to get the number right. The founding partners know from the inside how contractors build their budgets — they know exactly where the margin is inflated and where the risk is real.

Does this sound like your case? Tell us about your project and we will tell you where to start.